CADENCE: コスト総和を超えた実測MAPF実行時間の予測
CADENCE: Predicting Realized MAPF Execution Time Beyond Sum of Costs
マルチエージェント経路探索(MAPF)の評価指標と実ロボット実行時間の乖離を調べ、実行前に得られる特徴量から完了時間を予測する手法を提案・検証した。
詳しい要約
1. どんなもの?
2. 先行研究と比べてどこがすごい?
3. 技術・手法の肝は?
4. どうやって有効だと検証した?
5. 議論はある?
6. 次に読むべき論文は?
※ AIが要旨から生成した要約です。正確性は原文をご確認ください。
著者: Abhishek Seetharamu, Badrikanath Praharaj, Sreeram MV
分類: cs.RO
原文アブストラクト
Multi-Agent Path Finding (MAPF) algorithms are increasingly used to plan motion for robot teams in industrial warehouses and robotic shared workspaces, but standard MAPF algorithm evaluation metrics, such as Sum of Costs (SoC), makespan, and planner runtime, can obscure how planner choices translate into realistic execution performance. We present CADENCE (Coordination and Action-Driven Estimation for Networked Continuous Execution), a hardware study of this evaluation gap on a fixed 7 by 7 workcell with seven differential drive robots, asking which features available before execution can best predict final wall-clock completion time. We compare SoC, total planned travel cost, primitive motion burden (how much basic motion the plan requires, such as makespan, turns, consecutive moves, and start-stop transitions), and interaction aware coordination structure (how much inter-robot coordination the plan induces, such as dependency links, interacting robot pairs, dependency depth, and crowding exposure). To test this, we generate 120 plans across 15 scenarios -- 5 Empty, 5 Medium Random, and 5 Bottleneck and execute each plan four times, yielding a 480 trial hardware corpus. Using both a scenario-held -- out ridge model and a trial-level mixed-effects model, we find that SoC alone is informative but incomplete, while primitive motion burden gives the strongest improvement, reducing held out error by about 48.6%-59.8% in MAE and 44.2%-61.4% in RMSE relative to SoC-only models. Interaction-aware coordination features add smaller, less uniform gains, most clearly in the mixed-effects analysis. Across both models and uncertainty checks, primitive motion burden is the most reliable additional signal beyond SoC, suggesting that much of the execution time gap is already visible in the offline plan before any robot starts moving.
